დაგვიკავშირდით
-
საქართველო / ბათუმი / ფარნავაზ მეფე 131
The La Batumi Familia project will be implemented by the RenaiSuncity development company, which has been on the market since 2012. The developer's main advantages are an experienced team and the use of modern construction technologies, which ensures the reliability and quality of construction.
The developer participates in the Bank of Georgia's bank guarantee program for developers. The bank provides comprehensive financial support to the residential complex. This is a guarantee that La Batumi Familia will be commissioned on schedule.
La Batumi Familia is a modern residential complex in a quiet and environmentally friendly environment with developed infrastructure for a comfortable family life in the city. The complex is located in the actively developing New Boulevard area within walking distance of the coast and the largest shopping center in Batumi.
About the residential complex:
Number of floors - 19
Delivery date of the building - Q4 2024
Number of apartments - 287
Owners can start renovations from October 2024
Architecture of the building
Modern energy-efficient materials are used for the construction of the building, which reduce the cost of utilities and ensure high structural strength.
The design also took into account the seismic activity of the region and the local climate - the house has a flat non-exploitable roof, a monolithic reinforced concrete frame and walls made of foam blocks.
The facade is decorated in terracotta and white. It is decorated with panoramic metal-plastic windows and large open balconies with tempered glass railings. The increased window sizes contribute to good illumination of the premises with natural daylight.
The complex is equipped with modern utilities, technological equipment that supports the operation of all house systems, and silent passenger elevators. The house is gasified.
Location of the complex
The La Batumi Familia complex is located in the New Boulevard area, this is an actively developing location that is being built up with new city facilities and various elements of entertainment, household, family and social infrastructure, the largest shopping center in the city, Metro City, is located here.
The main advantages of the area include a large number of parking spaces and recreation areas, as well as a low flow of tourists compared to the central areas.
Everything you need for a comfortable life is within walking distance:
- Carrefour shops and supermarket
- Lech and Maria Kaczynskikh Park
- restaurants and cafes
- banks
- fitness clubs
- beauty salons
- school, etc.
Distance:
to school - 300 m
to Primorsky Boulevard and park - 400 m
to shopping center - 500 m
to beach - 600 m
Infrastructure of the complex
The infrastructure of the residential complex has everything you need for a comfortable life:
Underground/surface parking for 70 cars
Supermarket
Cafe
Pharmacy
Open terrace
Fitness center
Business center
Green yard 1,500 m2
Children's playground
Service
The company will take on full comprehensive maintenance of the complex, namely:
Concierge service
Landscaping
Cleaning
Yard care and common areas
24-hour security and video surveillance
Payment methods
- 100% cash payment
- Cashless payment to the developer's account
- Interest-free installments for 12 months with a down payment of 30%
- Payment in cryptocurrency
Finishing options:
1) Black frame
Metal-plastic doors and windows with double heat-treated glass
Iron entrance door
Balcony with painted walls
Floor screed on the balcony
Fully landscaped common areas (stairs, corridor and hallway)
Facade cladding with aluminum composite panel and a combination of facade glass unit (heat-treated glass)
Utilities provided to the apartment (electricity, water, gas)
2) White frame - the same as included in the black frame, additionally:
Water supply points and electrical wiring inside the apartment
Floor screed in the apartment
Gas supplied to the apartment (1 period)
Internal partitions as desired, built and plastered
Walls treated with plaster
Current stage of construction
Completed stages of construction:
Stage 1 - main electrical cables installed
Stage 2 - water pipes installed
Stage 3 - fire safety system installed
Stage 4 - house facade completed
Stage 5 - stairs built
Stage 6 - main doors installed
Stage 7 - inter-apartment walls built
Stage 8 - all apartments glazed