Contact us
-
Georgia / Batumi / 131 str. Parnavaz Mepe
27-storey residential complex Sea Side comfort class is located in the new part of Batumi, 400 meters from the sea and beach, New Boulevard.
Nearby are 5-star Euphoria hotel, the Eclipse casino, Metro City shopping center, and various cafes and restaurants.
Infrastructure and services of the complex:
- Heated swimming pool
- SPA
- Children's Playground (during the seasonal period, animators will work on the Playground)
- Cleaning service
- Parking
- 24x7 security
- Gym
- Surveillance system
- Shuttle service and car rental (bicycles and electric scooters are available)
- Apartment management service
- Temporary nanny service
- Excursion program
- Cleaning and Laundry services
- Reception
Control of the house:
- Renovation works on the common area and in the apartments
- Ensuring the cleanliness of the entrance, corridors, and surrounding area
- Ensuring the safety of the territory and residents
- Improvement of the territory and entrances
- Maintenance of the pool, Parking and other infrastructure
Condition of the house:
- The house is fully supplied with gas
- HYDRO and noise Insulation
- Modern fire safety system of European standard
- Well-maintained entrance-finished with natural stone in a composition with granite
- Entrance doors are metal, fireproof, with an electronic lock and one universal key
Apartments in black frame:
- Installed metal-plastic Windows.
- Installed entrance doors.
- Communications connected to the entrance door
The cost of apartments in black frame from $600 m2 depending on the floor and location.
Apartment with turnkey repair:
- Fully completed design renovation using high-quality materials
- Installed heating and water heating systems
- Conducted and configured Internet and cable TV
- All necessary furniture and appliances in the apartment
- Small household items for the convenience of guests
The cost of apartments with turnkey repairs from $950 m2 depending on the floor and location.
Interest-free installments until the end of construction
Down payment 30%
Completion construction November 2021